Growing rapidly, Carlisle Construction Materials (CCM) was faced with the need to expand their existing 100-acre industrial campus that supports their world-wide operations.
Project design included a state-of-the-art Executive Training and Education complete with parking areas for 200 cars and associated loading spaces. The project site was located on a constrained piece of the nearly built out CCM Campus, which also contained Karst geology causing an elevated risk of sinkholes and solution activities. To address these issues while still complying with stormwater regulations, SDC designed underground stormwater management systems under the proposed parking lot that utilized chamber systems with an impermeable liner.